GE LOGIQ E9 Service Manual page 407

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Table 8-75
DO NOT connect the Monitor power cable to the power (P2) or (P3) connector on the Bulkhead
when the LOGIQ E9 is powered up. Damage to the Monitor Power Cable and/or the Bulkhead
Board can occur. See images below of damage that can occur.
6.
23 inch Monitor and Bulkhead Board
P/N 5492372. If OLED, go to Step 8.
Connect the Monitor cables; Video (P10),
power/USB (P2) to the Monitor and
accessory USB (P3) to the Bulkhead Board
(USB lower port). See Bulkhead layout in
Step 7 for reference.
Go to Step 10.
7.
P1 = 48V Gel Warmer power
P2 = 48V/USB (power and accessory USB
for 23 inch Monitor)
P3 = 48V/USB (power and accessory USB
for OLED Monitor {USB, lower portion of
port is used for USB for 23 inch Monitor})
P10 = video (HDMI)
A = Bulkhead ground
. 2
EV
Monitor Arm assembly (Ergotron) installation - R5 and later production
Steps
NOTICE
48VDC pin in the P3 connector (center pin), shows damage.
The outside two pins are Ground. Cable left, Bulkhead Connector right.
R6 and later Bulkhead Board
(P/N 5492372)
Chapter 8 Replacement procedures
LOGIQ E9 S
Corresponding Graphic
Monitor Cables to Bulkhead
23 inch - R6 and later
M
ERVICE
ANUAL
8 - 123

Advertisement

Table of Contents
loading

Table of Contents