GE LOGIQ E9 Service Manual page 571

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Table 8-177 Capacitor Pack removal
4.
Unlatch the two latches (1) that clamp the
Capacitor Pack to the top of the BEP (2).
Tilt the Main Console Front Cover forward
just until the lower Column Cover stop tabs
(3) clear and slide the Shear Wave Console
Cover Assembly (4) out.
Lift the Column Cover Assembly.
Push the Capacitor Pack toward the Card
Cage approximately 1/2 inch to free the
Pack the BEP.
Remove the Capacitor Pack.
8-11-9-2
Capacitor Pack installation
Table 8-178 Capacitor Pack Installation
1.
Place the Capacitor Pack on top of the
BEP.
Reconnect the power cable from the Main
Power Supply to the Pack BCM1 and
BCM2. Power Cable is labeled.
. 2
EV
Steps
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
ERVICE
Corresponding Graphic
Corresponding Graphic
M
ANUAL
8 - 287

Advertisement

Table of Contents
loading

Table of Contents