GE LOGIQ E9 Service Manual page 318

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-5-4-1
Shear Wave Console Cover removal / installation
NOTE:
Whenever the left Side Cover is removed, clear the BEP Fan(s) intake(s) of any debris.
Table 8-9
1.
Loosening the Top Cover or removing it will
allow the Front Cover to flex enough to
slide the Shear Wave Console Cover out.
Slide the Cover out.
2.
Re-install the replacemnt Cover.
3.
Re-install the Top Cover, if removed and the Side Cover.
4.
If the Top Cover was removed, perform Functional Checks. See:
adjustments,
8 - 34
. 2
EV
Shear Wave Console Cover removal / installation
Steps
8-5-5-4 - Verification
Section 8-5 - Replacing Covers and Bumpers
Corresponding Graphic
and
8-5-5-5 "Functional Checks" on page
LOGIQ E9 S
M
ERVICE
8-5-5-3 - Calibration and
8-37.
ANUAL

Advertisement

Table of Contents
loading

Table of Contents