APS (Application Plus Server) 4.1 Users Guide
SS7 Gateway Tasks
144
Use these tasks to configure, start, and monitor the SS7 gateway:
n
Changing an SS7 Configuration File
n
Configuring the SS7 Gateway
n
Starting and Stopping the SS7 Gateway
n
Administering the Signaling Point Code
n
Monitoring SS7 Gateway
n
Displaying the State of the SS7 Links
n
Changing the State of the SS7 Links
Please be aware that small changes to the SS7 configuration can have far
reaching effects. Also, not having an SS7 connection to HLR can result in
no production. We recommend that when working with the SS7 screens
provided by the APS interface, and when working with the SS7 protocol,
experienced engineers are available to suggest, implement, and test your
work.
101-1830-001
Issue 1.0
Need help?
Do you have a question about the AP-3 and is the answer not in the manual?