Back End Processor Installation Procedure

NOTE:
When performing this procedure, handle boards carefully and take the following precautionary measures:
CAUTION:
TAKING THE NECESSARY ESD PRECAUTIONS:
1.ALWAYS CONNECT YOURSELF, VIA AN ARM-WRIST STRAP, TO THE ADVISED ESD
CONNECTION POINT LOCATED ON THE REAR OF THE SCANNER (TO THE RIGHT OF
THE POWER CONNECTOR).
2.FOLLOW GENERAL GUIDELINES FOR HANDLING OF ELECTROSTATIC SENSITIVE
EQUIPMENT.
NOTE:
Care should also be taken to install the boards in the correct slots - refer to
Figure 8-40
1) Install the MO Driver into the new BEP, as described in the
8 - 69, if applicable.
2) Remove the Octopus Card Holder as described in the
Procedure
3) Install the SCSI Board, as described in the
applicable.
4) Install the ECG Module, as described in the
5) Install the PC VIC Assembly, as described in the
6) Install the Plug and Scan Battery (if applicable), as described in the
Procedure
7) Install the Plug and Scan Board (if applicable), as described in the
Procedure
8) Install the PC2IP Board, as described in the
9.) Install the Frame Grabber Board (RFI systems only), as described in the
Installation Procedure
10) Install the Keyboard Control Card, as described in the
Procedure
11) Install the Octopus Card Holder as described in the
Procedure
12) Carefully return the new BEP to the original position on the machine chassis.
8-50
3
EVISION
PC2IP Board Removal Procedure
DO NOT TOUCH ANY BOARDS WITH INTEGRATED CIRCUITS PRIOR TO
on page 8-47, as applicable.
on page 8 - 56.
on page 8 - 59.
on page 8 - 57.
on page 8 - 64.
on page 8 - 65.
on page 8 - 56.
Section 8-5 - Back End Parts Replacement
Frame Grabber Board Removal Procedure
Keyboard Control Board Removal Procedure
BEP2 - Octopus Card Holder Removal
SCSI Board Installation Procedure
BEP2 - ECG Module Installation Procedure
PC-VIC Installation Procedure
PC2IP Board Installation Procedure
Keyboard Control Board Installation
BEP2 - Octopus Card Holder Installation
V
™ 4 S
IVID
on page 8 - 65.
on page 8 - 63.
Figure 8-39
on page 8-46 and
MO Drive Installation Procedure
on page 8 - 61, if
on page 8 - 74·
Plug & Scan Battery Installation
Plug & Scan Board Installation
Frame Grabber Board