GE Vivid 4 BT03 RFI Service Manual page 193

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2392751-100, R
IRECTION
TR4 Boards
TR4 Boards
Power Supply
Power Supply
The Front End can be divided into two subsystems, as follows:
1.) The Front End subsystem which includes:
-
-
-
2.) The Mid Processors subsystem which includes:
-
3
EVISION
Front
Front
Board
Board
Tx P.S.
Tx P.S.
L.V P.S
L.V P.S
(Front End Controller)
(Front End Controller)
Vingmed manufactured boards
Vingmed manufactured boards
Figure 5-6 Front End Crate Block Diagram - RFT Configuration
Front Board
MUX Board
BF64 (Beamformer Board)
RFI (Radio Frequency Interface Board)
OR
*
FEC (Front End Controller Board)
*
RFT (Radio Frequency & Tissue Board)
*
IMP (Image Port).
Chapter 5 - Components and Function (Theory)
Beam Former
Beam Former
MUX
MUX
Board
Board
FE bus
FE bus
I
I
C bus
C bus
2
2
FEC
FEC
VME bus
VME bus
Board
Board
2
2
I C bus
I C bus
V
™ 4 S
IVID
64Ch
64Ch
A/D
A/D
Board
Board
Image Port
Image Port
M
ERVICE
ANUAL
RFT
RFT
Board
Board
Pipeline
Pipeline
link
link
Board
Board
PCI2IP
PCI2IP
5-9

Advertisement

Table of Contents
loading

Table of Contents