Tr Switch Test - GE Vivid 4 BT03 RFI Service Manual

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2392751-100, R
IRECTION
7-3-8-5

TR Switch Test

If a solid line is observed during scanning, it may indicate a bad TR switch. This test checks the transmit
switches.
1) Connect a 3S probe and lock it in place.
Note: To avoid irrelevant failure results, it is imperative that the probe be in good condition.
2) Access the F.B. tab of the FE Diagnostics dialog box, as described in the
Assembly Options
3) In the Select Socket area of the F.B. tab, trackball to the socket to which the 3S probe is connected:
4) Trackball to Pulser 1 (High Voltage Power Supply [HVPS] +/-80V) or Pulser 2 (Low Voltage Power
Supply [LVPS] +/-40V) and press Select.
5) Trackball to the TR Switch Test button and press Select. The TR switch test is performed, and the
test results are displayed in the Report dialog box, as shown below:
3
EVISION
section, on page 7-26.
Trackball to Left, Right or Center and press Select.
Figure 7-21 Report Dialog Box - TR Switch Test
Chapter 7 - Diagnostics/Troubleshooting
V
™ 4 S
M
IVID
ERVICE
ANUAL
Accessing the Front Board
7-39

Advertisement

Table of Contents
loading

Table of Contents