Front End Boards Installation Procedure - GE Vivid 4 BT03 RFI Service Manual

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2392751-100, R
IRECTION
4) Gently pull the required card from the crate.
CAUTION: When removing the card, ESD may cause damage to the card. Always have the ESD hand
strip connected to the machine chassis and to your hand.
8-4-1-4

Front End Boards Installation Procedure

1) Gently slide and push the required card to its original location, using the metal frame guiding tracks.
2) Use the plastic latches to firmly lock in the card in position, so that the connectors are firmly placed
in their sockets.
3) Return the front door of the crate to its original position and tighten the two screws that secure the
door in place.
4) Return the left side cover to its original position, as described in the
Procedure
Note: When you insert a Front End Board into the crate, ensure that the probe connector's metal
frame slides into its tracks.
Note: The
replaced. Refer to the instructions on page 6-13
8-36
3
EVISION
on page 8 - 4.
Beamformer Calibration
Section 8-4 - Front End Parts Replacement
procedure must be performed each time a Beamformer is
V
™ 4 S
M
IVID
ERVICE
Side Covers Installation
ANUAL

Advertisement

Table of Contents
loading

Table of Contents