Gas Spring Cable Installation Procedure - GE Vivid 4 BT03 RFI Service Manual

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2392751-100, R
IRECTION
8-6-5-3

Gas Spring Cable Installation Procedure

1) Raise the control console to its maximum height.
2) Route the gas spring cable along its original path in the machine. The end of the cable with the
adjustable sleeve should be next to the up/down/swivel handle at the front of the unit; the other end
of the cable should be next to the lower end of the gas spring at the rear of the unit.
NOTE:
For clarification, the letters appearing in square brackets [ ] in the following steps correspond to the
letters shown in
3) Working from the rear of the machine, fit the cable end stopper [D] on the trigger arm [E] - refer to
Figure 8-72
4) Fit the groove of the cable end sleeve [C] on the hinge of the gas spring head.
5) Turn the cable holder [B] over the cable end sleeve, and then fasten it with the securing screw [A].
6) Working from the front of the machine, insert the other cable end stopper into the through the
grooved slot on the handle assembly carefully aligning the groove on the cable with that of the
groove in the slot (refer to the detail shown in
7.) Feed the gas spring cable down into the slot in the cable retaining bracket (refer to
page 8-102) and tighten the securing nut against the bracket to hold the cable firmly in position -
refer also to
8.) Slide the cable retaining bracket backwards (previously moved forwards) along the chassis beam
sufficiently to regain tension on the cable. Using an M4 Allen key, tighten the two cap screws on the
bracket to hold it firmly in position - refer to
9) Using the Up/Down/Swivel handle, lower and raise the control console several times to verify its
proper operation.
10) Fasten the cables to the machine with cable ties (at the original positions - see
Gas spring cable
11.)Return the keyboard (previously removed) as described in the
page 8 - 27.
12.)Return the control console upper cover front section, as described in the
Cover (Front) Installation Procedure
13) Return the control console lower cover, as described in the
Installation Procedure
8-92
3
EVISION
Figure 8-71
on page 8-89 and
on page 8-90.
Figure 8-87
on page 8-100.
Figure 8-75 Cables Fastened with Cable Ties
on page 8 - 18.
Section 8-6 - Lower Section Components Replacement
Figure 8-72
on page 8-90.
Figure 8-88
on page 8-101).
Figure 8-73
on page 8-90.
on page 8 - 15.
Control Console Lower Cover
V
™ 4 S
IVID
ERVICE
Figure 8-90
Figure 8-75
Cable ties
Keyboard Installation Procedure
Control Console Upper
M
ANUAL
on
below).
on

Advertisement

Table of Contents
loading

Table of Contents