Section 3-2

Installation Reminders

3-2-1

Average Installation Time

Once the site has been prepared, the average installation time required is shown in
Table 3-2
Description
Unpacking the scanner
Installing the scanner
DICOM Option
(connectivity)
3-2-2

Installation Warnings

1.) Since the Vivid 3N weighs 160 kg (353 lbs) or more, without options, two persons are always
required to unpack it. This is also applicable when installing any additional items in excess of 16 kg
(35 lbs).
2.) There are no operator-serviceable components. To prevent shock, do not remove any covers or
panels. Should problems or malfunctions occur, unplug the power cord. Only qualified service
personnel should carry out servicing and troubleshooting.
3-2-2-1
System Acclimation Time
Following transport, the Vivid 3N system may be very cold, or hot. Allow time for the system to acclimate
before being switched ON. Acclimation requires 1 hour for each 2.5
the system is below 10
.
Turning the system ON after arrival at the site - without allowing time for acclimation - may
CAUTION
cause system damage!
°
60
55
50
45
C
°
140
131
122
113
F
8
6
4
Hrs
3-2
04
EVISION
Average Installation Time
Installation Time
0.5 - 2.0 hours
o
C or above 35
Table 3-3 Vivid 3N System Acclimation Time
40
35
30
25
104
96
86
77
2
0
0
0
0
Section 3-2 - Installation Reminders
Average
0.5 hour
0.5 hour
Time may vary, according to the required configuration
Time may vary, according to the required configuration
o
C
20
15
10
5
68
59
50
41
32
0
0
0
2
V
3N P
/E
IVID
RO
XPERT
Comments
o
C increment, when the temperature of
0
-5
-10
-15
-20
23
14
5
-4
4
6
8
10
12
S
M
ERVICE
ANUAL
Table 3-2
below.
-25
-30
-35
-40
-13
-22
-31
-40
14
16
18
20

Advertisement