GE Vivid 3N Pro Series Service Manual page 403

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
8-3-2-5
Installing a New VIC Correlation Box
NOTE:
This procedure should be performed only when installing a Samsung 17" monitor, or
when replacing an existing VIC Correlation box!
NOTE:
Before commencing this procedure, check that system has been disconnected from the mains power
as described in
1.) Remove the machine's side covers see
2.) Unscrew and remove the two screws located on the upper BEP bracket.
3.) Unscrew and remove the two screws located at the top of the bracket that connects the VIC
assembly to the metal frame - see
4.) Rotate the VIC sideways and pull out the VGA cable.
5.) Assemble the VIC correlation module and connect it to VGA OUT on the VIC module.
6.) Connect the cable to VIC correlation module and pass it through BEAM 3 energy chain and up into
the VGA box.
7.) Return the VIC to its original position above the BEP - see
04
EVISION
step 1
of
8-3-2-3 "Vivid 3 17" Monitor Removal - Procedure 1" on page
Screw securing
VIC GND cable
Figure 8-34 VIC Assembly
Chapter 8 Replacement Procedures
8-2-2-3 "Side Covers Removal Procedure" on page 8-4
Figure
8-34.
Screws securing VIC bracket
V
3N P
/E
S
IVID
RO
XPERT
ERVICE
Figure
8-35.
M
ANUAL
8-31.
8-33

Advertisement

Table of Contents
loading

Table of Contents