GE Vivid 3N Pro Series Service Manual page 592

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
10-7-9-3
No Meter Probe Adapter Procedure
Follow these steps to test each transducer for leakage current.
1.) Turn the Vivid 3N Pro/Expert unit OFF.
2.) Plug the unit into the test meter, and the meter into the tested AC wall outlet.
3.) Plug the external probe into the meter "EXTERNAL" connector.
4.) Set the meter's "FUNCTION" switch to EXTERNAL position.
5.) Connect the probe for test with the connector of the console.
6.) Add the saline probe and the imaging area of the probe into the saline bath.
7.) Turn unit power ON for the first part; turn it OFF for the second half.
8.) Depress the ISO TEST rocker switch and record the highest current reading.
9.) Follow the test conditions described in
10.)Keep a record of the results with other hard copies of PM data.
10-28
04
EVISION
Figure 10-6 Check Without Probe Adapter
Section 10-7 - Electrical Safety Tests
V
IVID
Table 10-21
for every transducer.
3N P
/E
S
RO
XPERT
ERVICE
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents