Installation And Maintenance - GE 9100c Technical Reference Manual

Anesthesia machine
Table of Contents

Advertisement

WARNING
In this section
M1207026
M1207027
Reproduced from the electronic master in MATRIX

6 Installation and Maintenance

This section covers the regular maintenance procedures
(minimum requirements) needed to make sure that the
9100c Anesthesia Machine - including the ventilator -
operates to specifications.
6.1 9100c Installation Checklist . . . . . . . . . . . . . . . . . . . . . . 6-2
6.2 9100c Planned Maintenance . . . . . . . . . . . . . . . . . . . . . 6-4
6.2.1 Every twelve (12) months . . . . . . . . . . . . . . . . . . . 6-4
6.2.2 Every twenty-four (24) months . . . . . . . . . . . . . . . 6-5
6.3 Free breathing valve maintenance . . . . . . . . . . . . . . . . . 6-6
6.4 Adjust drive gas regulator . . . . . . . . . . . . . . . . . . . . . . . 6-7
6.5 MOPV pressure relief valve test . . . . . . . . . . . . . . . . . . 6-8
6.6 Exhalation valve relief valve test . . . . . . . . . . . . . . . . . . 6-9
004
MANUAL−DOC, Technical Reference Manual, Technical Reference Manual for 9100c, English
6-1

Advertisement

Table of Contents
loading

Table of Contents