Stratasys FDM 2000 Manual page 70

Table of Contents

Advertisement

A-22
Material Handling for E20 Elastomer
1.
2.
3.
Finishing Parts Built Using Elastomer
1.
2.
3.
4.
Applications Manual
Do not open the sealed bag until you are ready to load the
elastomer.
Do not leave the spool in an open environment.
Store unwrapped E20 and E20R material that is not in use in a
dry box with desiccant.
Supports are removed by tearing them away from the part.
This can be done by hand or with tools such as small chisels or
pliers.
Supports are easier to remove when the part is warm.
The surface finish can be smoothed using standard files and
sandpaper. Coarser grits are recommended.
Gaps can be filled and surface finish improved by carefully
applying heat with a hot knife to melt filament into a part, then
sanding the surface smooth.
10MAY01
Reference

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fdm 3000Fdm 8000

Table of Contents