24 Introduction to the manual

Quick installation and start-up flowchart

Plan the electrical installation and acquire
the accessories needed (cables, fuses,
Check the ratings, required cooling air
flow, input power connection,
compatibility of the motor, motor
connection, and other technical data.
Check the installation site.
Unpack and check the units (only intact
units may be started up).
Check that all necessary optional
modules and equipment are present and
correct.
Mount the drive.
Route the cables.
Check the insulation of the supply cable,
the motor and the motor cable.
Connect the power cable.
Connect the motor cable.
Connect the control cables.
Check the installation.
Start the drive.
Task
etc.).
See
Planning the electrical installation
(page 41)
Cooling and degrees of protection
(page 36)
Technical data
Cabinet construction
(page 36)
Contents of the package
Installation procedure
Routing the cables
Checking the insulation of the assembly
(page 50)
Power cable connection
Electrical installation: input / output
(page 59)
Installation checklist
Start-up
(page 93)
(page 147)
(page 34)
(page 39)
(page 47)
(page 51)
(page 91)