Festo CPV-D102 Elektronics Manual page 71

With field bus direct connection
Table of Contents

Advertisement

2. Commissioning CPV−DI02 (PROFIBUS−DP)
Festo P.BE−CPV−DI02−EN en 0704NH
2. Open the following folder in the hardware catalogue:
\PROFIBUS−DP\Additional Field Devices\Valves."
The folder Valves" is displayed when you copy the GSD
(see step 1 of the preparations).
Pull the station type Festo CPV−DI02" onto the line of the
DP master system 2.
The dialogue window Properties PROFIBUS interface"
will be displayed 3.
3. Select the PROFIBUS address identical to the selected
setting on the DIL switch in the switch module (see
section 1.2.2) and close with OK.
The icon of the valve terminal will be displayed on the line
of the DP master system.
4. If necessary, process the dialogue window Properties
DP slave" 4: Double−click on the icon of the valve terminal.
2−13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv-di02Profibud-dpCpv-cs02Abb cs31Profibus-dpCpv-di02 profibus-dp series ... Show all

Table of Contents