1. Installation CPV−DI02 and CPV−CS02
1.2
Electrical connecting and display elements
1
2
3
4
1
Field bus connection
(9−pin Sub−D socket, see section 1.3.3)
2
Underneath the removable switch
cover: DIL switches and the SAVE
button (see section 1.2.1)
3
Operating/load voltage connection
(4−pin M12 plug, see section 1.5)
Fig. 1/1: Connecting and display elements on the CPV Direct
1−4
The following connecting and display elements can be found
on the CPV Direct:
4
5
6
Power LEDs PS, PL and bus status
LEDs BF, P (see section 3.1)
CPI extension connection
(see section 1.6)
Switching status displays of the
CP valve coils (yellow LEDs,
see section 3.1.3)
Festo P.BE−CPV−DI02−EN en 0704NH
5
6