1. Installation CPV−DI02 and CPV−CS02
1−6
Procedure:
1. Switch off the operating voltage.
2. Unscrew the screws in the switch cover and remove the
cover.
3. Set the station number and the diagnostic mode on the
DIL switch (see section 1.2.2).
4. If you have connected CPI/CP modules to the CPI exten
sion connection: read the procedure for configuring the
CPI/CP modules in section 1.6.
5. Replace the switch cover. Check that the seal is seated
correctly and tighten the fastening screws by hand.
Note
Make sure that the seal is seated correctly when you
refit the switch cover.
Festo P.BE−CPV−DI02−EN en 0704NH