Festo CPV-D102 Elektronics Manual page 69

With field bus direct connection
Table of Contents

Advertisement

2. Commissioning CPV−DI02 (PROFIBUS−DP)
Icons
Festo P.BE−CPV−DI02−EN en 0704NH
Note
As from STEP 7 V4.02, GSDs are stored within the STEP 7
project (station GSD). This can cause the updating/reading
of new GSD files to appear as if incorrect. Please inform
yourself about handling the station GSD files in the STEP 7
help.
2. Process the dialogue window Properties PROFIBUS"
Baud rate
Profile
3. Copy the icon files (see section 2.2) for the CPV Direct
into directory ...\STEP7\S7DATA\NSBMP on your PC or
programmer.
The icon files can either be:
copied manually into the above named directory or
loaded via the menu [Options] [Install new GSD] file
type Bitmap files" in HW Config.
4. Insert a DP master system:
Right−hand mouse click on DP" under CPU" in the rack.
Click on [Add master system] in the context menu.
The line of the DP master system will be displayed.
2−11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv-di02Profibud-dpCpv-cs02Abb cs31Profibus-dpCpv-di02 profibus-dp series ... Show all

Table of Contents