Festo CPV-D102 Elektronics Manual page 45

With field bus direct connection
Table of Contents

Advertisement

1. Installation CPV−DI02 and CPV−CS02
Festo P.BE−CPV−DI02−EN en 0704NH
Pin assignment of the power supply connection
1
1
Pin assignment
1: 24 V DC operating voltage for the electronics
(and inputs, with modules connected to the
extension connection) (max. 2 A)
2: 24 V DC load voltage for the valves (max. 2 A)
3: 0 V
4: Earth/ground connection
Fig. 1/9: Pin assignment of the power supply connection
Potential equalization
The CPV valve terminal has 2 earth connections for potential
equalization:
on the power supply connection
on the end plate.
1−31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv-di02Profibud-dpCpv-cs02Abb cs31Profibus-dpCpv-di02 profibus-dp series ... Show all

Table of Contents