Figure 55: Attaching The Switch To The Plywood Base - Allied Telesis 950 Series Installation Manual

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

Chapter 6: Installing the Switch on a Wall
104
Figure 55. Attaching the Switch to the Plywood Base
4. Do one of the following:
To install the power supplies, go to "Installing AT-PWR600 AC
Power Supplies" on page 72.
To install an optional XEM2 Ethernet Line Card, go to "Installing an
Optional XEM2 Ethernet Line Card" on page 76.
If all the components are installed, go to Chapter 7, "Verifying and
Configuring the Switch" on page 109.

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents