Installing The Switch On A Plywood Base; Figure 53: Attaching The At-Brkt-J24 Wall Brackets To The X330 Switch - Allied Telesis x330 Series Installation Manual

Fanless gigabit layer 3 access switches
Hide thumbs Also See for x330 Series:
Table of Contents

Advertisement

Chapter 7: Installing x330-20GTX and x330-28GTX Switches on a Wall
Installing the
Switch on a
Plywood Base
90
This procedure assumes that the plywood base for the switch is already
installed on the wall. Review "Reviewing Safety Precautions" on page 40
and "Choosing a Site for the Switch" on page 44 before performing this
procedure. Allied Telesis recommends a minimum of two people for this
procedure.
Warning
The device is heavy. Always ask for assistance before moving or
lifting it to avoid injuring yourself or damaging the equipment.
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is improperly fastened to the wall. 
E105
To install the switch on the plywood base, perform the following
procedure:
1. Place the switch on a table.
Note
If the bumper feet are attached to the bottom on the switch, remove
them before continuing.
2. Attach the four AT-BRKT-J24 wall brackets to the sides of the switch,
with the sixteen M4x6mm screws included in the brackets kit. Refer to
Figure 53.
Figure 53. Attaching the AT-BRKT-J24 Wall Brackets to the x330 Switch

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtx

Table of Contents