Exhaust System and Intake Manifold
DODGE Turbo Diesei
Air System
Page 11-13
Intake Manifold Cover and Gasket - Replacement
Preparatory Steps:
• Remove the throttle control bracket and linkage.
- Remove the high pressure fuel lines.
- Disconnect the intake manifold heater.
• Disconnect the fuel heater ground wire from intake manifold.
- Remove the air crossover tube and the intake manifold heater.
13mm, 3/8 inch
Remove the manifoid cover and complete the following steps.