Base Engine Components
DODGE Turbo Diesel
Engine Lubricating System
Page9B-2i
Note: To prevent damage to the seal carrier, hit the
alignment/installation tool alternately at the 12, 3, 6 and 9
o'clock positions.
Use the alignment/installation tool and a plastic hammer to
install the seal to the correct depth.
17mm
Install the front cover oH fill and seals.
Install oil fill tube bracket capscrew.
Torque Value: 43 N-m [32 ft-lbs]