Dodge D250 1990 Service Manual page 252

Rear wheel drive ram truck, diesel supplement
Hide thumbs Also See for D250 1990:
Table of Contents

Advertisement

Base Engine Components
DODGE Turbo Diesel
In-Chassis Repairs
Page9F-23
13mm
Caution; Be sure to lubricate the push rod sockets with
clean engine oil.
Install the rocker lever pedestal capscrews.
Torque Value: 24N-m [18 ft-lbs]
14mm, Screwdriver
Adjust the valve clearance.
Note: Refer to Valve Clearance Adjustment Section for valve
set procedure.
15mm
Install the valve covers.
Torque Value: 24 N-m [18 ft-lbs]
Install the parts previously removed:
• Valve covers
• Injector Nozzles
- Fuel lines
• Fuel Alter
• Exhaust manifold
• Turbocharger and air crossover
• Connect the radiator and heater hoses
• Fill the engine with new coolant and oil

Advertisement

Table of Contents
loading

This manual is also suitable for:

D350 1990W250 1990W350 1990

Table of Contents