Mounting and Powering the SCG
In this chapter:
•
Mounting the SCG onto a Server Rack
•
What You Will Need
•
Step 1: Unpack the Rack Mount Kit
•
Step 2: Separate the Slide Rails into the Inner and Outer Parts
•
Step 3: Install the Outer Rail Slides to the Rack Posts
•
Step 4: Fasten the Shoulder Screws to the Server
•
Step 5: Install the Inner Rails on the Server
•
Step 6: Fasten the Inner Rails to the Server
•
Step 7: Attach the Mounting Ears to the Rail Assembly
•
Step 8: Slide the Rail Assembly into the Outer Rails and Secure to the Rack
•
Powering On the SCG
SmartCell Gateway 200 Getting Started Guide for SmartZone 3.5.1, 800-71517-001 Rev A
2
21
Need help?
Do you have a question about the SmartCell Gateway 200 and is the answer not in the manual?
Questions and answers