Connecting Valves And Transformer - Hunter X-Core Owners Manual And Programming Instructions

Residential irrigation controller
Table of Contents

Advertisement

CoNNECTING ValVEs aND TraNsformEr

Installation of the X-Core should only be done by trained personnel.
1. Route valve wires between the control valve location and controller.
2. At valves, attach a common wire to either solenoid wire on all
valves. This is most commonly a white colored wire. Attach a
separate control wire to the remaining wire of each valve. All wire
connections should be done using waterproof connectors.
3. Route the valve wires through the conduit. Attach the conduit
through the bottom right side of the controller.
4. Secure the white valve common wire to the C (Common) screw on
the terminal strip. Attach each of the individual valve control wires
to the appropriate station terminals and tighten their screws.
5. Indoor Models: route the transformer cable through the hole on
the left side of the controller and connect the wires to the two
screws marked 24VAC.
Outdoor Models: transformer wires are already connected to the
AC terminals so all that is required is to connect primary power to
the junction box (see below).
NoTE: X-Core outdoor models are water and
weather resistant. Connecting the outdoor X-Core
to primary AC power should only be done by a
licensed electrician following all local codes. Improper
installation could result in shock or fire hazard.
BAT
Connect the two transformer
wires to the two aC Terminals
High Voltage Wiring (Outdoor Model only)
1. Route AC power cable and conduit through the ½" (13 mm)
conduit opening on the left side bottom of the cabinet.
2. Connect one wire to each of the two wires inside the junction
box. The ground wire should be connected to the green wire.
Wire nuts are provided to make these connections.
note: For –e models only: Connect the wires to the AC
terminal block inside the junction box. AC supply wires must
be 14 AWG (1.85 mm) or larger with appropriate circuit
breaker for the wire size. A switch or circuit-breaker shall be
included in the building installation (in close proximity to the
controller, within easy reach of the operator) and marked as
the disconnecting device for the equipment.
3. Replace the junction box cover.
Valve 4
Valve 3
Valve 2
Valve
Valve 1
Wires
Valve Common Wire
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents