Hunter X-Core Owners Manual And Programming Instructions page 109

Residential irrigation controller
Table of Contents

Advertisement

Day of the Week Watering
1. Select the Program and DAYS .
2. Press the down arrow button to move the cursor to
Monday
3. Press the + button to water on Mondays or the –
button to not water on Mondays
4. As the cursor moves from day to day, press the +
or – button to water or not water on that day of the
week. Press the right and left arrow buttons to move
quickly to a specific day.
Interval Watering
1. Select the Program and INTERVAL with the + or –
buttons.
2. Press the down arrow button to Interval
3. Press the + or – button to select the number of days
between watering
4. Press the down arrow button to Next Water
5. Press the + or – button to select the number of
days until the next watering. If Next Water has
"0 days" for a value, that indicates that any scheduled
watering for that day will water at its programmed
start time. If it has a value of "1 Day," the scheduled
programming will water tomorrow.
non-Water Days: This feature can be used to omit
watering on mowing days, etc. The days with N will not
water, even if they would normally occur at one of the
Interval days set above.
1. Press the down button to MON
2. Press the right and left arrow buttons to move the
cursor between the days
23
3. Press the – button when the cursor is on a day that
you do not want to water. An "N" will appear, to show
that day is never able to water, regardless of the
schedule.
4. If you select Odd or Even while in the Interval
schedule, the Odd or Even days will not be watered
even if they happen to be one of the Interval days to
water.
5. To change a non-water day back to a water day, use
the arrow buttons to go to that day and press the +
button. The "-" will disappear, and the day will be
available for Interval watering again.
Odd/Even Watering
1. Select the Program and ODD/EVEN with the + or –
buttons, as shown above in First Step
2. Press the down arrow button once, to select Odd or
Even.
3. Press the + or – button to toggle between ODD or
EVEN day watering
non-Water Days: This feature is frequently used to omit
watering on mowing days, etc.
1. Press the down button to MON
2. Press the right and left arrow buttons to move the
cursor between the days
3. Press the – button when the cursor is on a day that
you do not to water. An "N" will appear, to show
that day is never able to water, regardless of the
schedule.
4. To change a non-water day back to a water day, use
the arrow buttons to go to that day and press the +
button. The "-" will disappear, and the day will be
available for Odd or Even watering again.
SettInG PuMP AnD MASter VAlVe OPerAtIOn
Two items are programmed at this position:
• Pump or Master Valve (P/MV) operation by station.
Each station may have any combination of P/MV
outputs 1, 2, both, or neither, which will activate as
specified whenever the station is turned on.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents