Repacking The Router - Cisco ASR 1013 Hardware Installation Manual

Asr 1000 series
Hide thumbs Also See for ASR 1013:
Table of Contents

Advertisement

Repacking the Router

1
Step 11
Make certain the terminal block plug is fully seated in the terminal block header on the DC power supply panel. You
will hear a snap or click when installed properly.
Step 12
Remove the tape (if any) from the circuit-breaker switch handle and move the circuit-breaker switch handle to the on
position.
Step 13
On the rear of the router, place the power supply Standby switch in the on position (O) to turn on the router.
The power supply LEDs light when power is supplied to the router.
What to Do Next
This completes the procedure for connecting the DC power supply in the Cisco ASR 1001 Router.

Repacking the Router

If your system is damaged, you must repack it for return shipment.
Before you return the router or move the router to a different location, follow these instructions to repack the
system, using the original packaging material:
SUMMARY STEPS
1. Place the bottom packing material section inside the bottom of the shipping container.
2. Use at least two people to place the Cisco ASR 1000 Series Router inside the container. Be sure that the
chassis is positioned correctly before you lower it inside the container.
3. Place the top packing material over the top of the Cisco ASR 1000 Series Router.
4. Place both accessory boxes inside the cutouts in the top section of the packing material.
5. Fold the outside carton down over the top of the accessory boxes and seal with packing tape.
6. Wrap two packaging straps tightly around the top and bottom of the package to hold the outside carton
and the bottom pallet.
Cisco ASR 1000 Series Router Hardware Installation Guide
612
Lead wires secured with a
tie wrap
Removing and Replacing FRUs from the Cisco ASR 1000 Series Routers
2
DC power supply terminal
block plug being inserted
into terminal block header.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents