Sharp SF-2050 Service Manual page 68

Hide thumbs Also See for SF-2050:
Table of Contents

Advertisement

(3) DV bias voltage adjustment
1
Set the digital multi meter range to DCV 300V or greater.
2
Put test rods to the DV bias output check pin (BSCP) of the high
voltage unit and the chassis (GND).
3
Execute simulation 8-1. (A DV bias voltage is outputted for 30
sec.)
4
Adjust the DV bias voltage adjustment volume (VR-301) so that
the output voltage is –200V ±5V.
(4) Note for installation of rollers to the developing
unit
1
Be careful to the installing direction of the V ring.
2
Allow no clearance between the V ring and the rollers (sections
marked with "*").
Installation of φ8V ring, φ8 C ring, and φ5V ring.
3
Developing magnet roller
1) Be careful to the V ring direction as shown in the figure above.
2) Allow no clearance between the V ring and the rollers (sections
marked with "*").
*
Developer transport roller
φ 5 V ring
(5) Note for developing side seals F/R attachment
1
Attach developing side seal F so that the slit is aligned with line E
and the edge with the line D.
2
Attach developing side seal R so that the slit is aligned with line C
and the edge with line D.
*
φ 5 V ring
8 – 2
BSCP
φ 8 V ring
*
(Rear)
*
(Rear)
φ 5 V ring
D
C
VR-301
φ 8 V ring
φ 8 C ring
(Front)
*
MG roller
*
(Front)
Stirring roller
φ 5 V ring
D
E

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sf-c52

Table of Contents