4.5
Disconnection
After the CT test is finished, disconnect the CT under test from the CT Analyzer.
1. Wait until the red LED on the CT Analyzer is off.
2. Disconnect the measurement leads starting at the CT Analyzer.
Warning: Never disconnect measurement leads while the red LED on the
CT Analyzer is flashing. As long as the red LED is flashing, the output is active
and lethal voltages can occur due to the high energy stored in external
inductors.
Running a CT Test (Detailed)
57