201.xxx
Warning [201.xxx] Check connection. Measured ratio > 50000:1.
Reason:
Solution:
202.xxx
Warning [202.xxx] Check connection. Polarity of input SEC and power output are not
the same.
Reason:
Solution:
203.xxx
Warning [203.xxx] Check connection. Input SEC may be disconnected.
Reason:
Solution:
204.xxx
Warning [204.xxx] Check connection. Polarity of input PRIM and power output are not
the same.
Reason:
Solution:
204.xxx
Warning [204.xxx] Check CT SB2 switch box wiring: Wrong polarity at PRIM terminal.
Reason:
Solution:
205.xxx
Warning [205.xxx] Check connection. Input PRIM may be disconnected.
Reason:
Solution:
205.xxx
Warning [205.xxx] Check CT SB2 switch box wiring: PRIM IN terminal may be
disconnected.
Reason:
Solution:
206.xxx
Warning [206.xxx] Check connection. Ensure that the output is connected to the
primary side of the CT.
Reason:
Solution:
206.xxx
Warning [206.xxx] Check CT SB2 switch box wiring: CTA OUTPUT and/or PRIM OUT
terminal may be disconnected.
Reason:
Solution:
207.xxx
Warning [207.xxx] Check connection! OUTPUT may be disconnected.
Reason:
Solution:
Measurement input "Prim" is possibly not connected properly.
Check whether the primary side measurement input "Prim" is connected
properly.
Polarity of input "Sec" and "Output" are not the same.
Check whether the output generator ("Output") and measurement input "Sec"
are connected properly and with correct polarity.
Input signal at input "Sec" differs from the expected one.
Check whether the output generator ("Output") and measurement input "Sec"
are connected properly.
Input signal at input "Prim" differs from the expected one: Reverse polarity at
input "Prim".
Check whether the output generator ("Output") and measurement input "Prim"
are connected properly and with correct polarity.
Input signal at input "PRIM" differs from the expected one: Reverse polarity at
CT SB2 input "PRIM".
Check whether the PRIM IN sockets on the CT SB2 are connected properly
and with correct polarity. If necessary, connect with changed polarity.
Input signal at input "Prim" differs from the expected one.
Check whether the output generator ("Output") and measurement input "Prim"
are connected properly.
Input signal at input "Prim" differs from the expected one.
Check whether the PRIM IN sockets on the CT SB2 are connected properly.
Input signal at input "Prim" differs from the expected one.
Check that the output generator ("Output") is connected to the CT and that the
primary side of the CT is connected to input "Prim".
Input signal at input "Prim" differs from the expected one.
Check whether the PRIM OUT and the PRIM IN sockets on the CT SB2 are
connected correctly to the primary side of the CT.
The current signal differs from the expected one.
Check whether the output generator ("Output") and measurement input "SEC"
are connected properly to the secondary side of the CT.