Advanced commissioning
6.4 Setpoint calculation
Procedure
To interconnect the scaling of the ramp-up and ramp-down times with PZD receive word 3
from the fieldbus in the inverter, proceed as follows:
1. Set p1138 = 2050[2].
This means that you have interconnected the scaling factor for the ramp-up time with
PZD receive word 3.
2. Set p1139 = 2050[2].
This means that you have interconnected the scaling factor for the ramp-down time with
PZD receive word 3.
The inverter receives the value for scaling the ramp-up and ramp-down times via PZD
receive word 3.
You will find further information in the Internet at: FAQ
(https://support.industry.siemens.com/cs/ww/en/view/82604741).
192
Operating Instructions, 07/2015, FW V4.7 SP3, A5E34263257B AC
SINAMICS G120C converter

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120c

Table of Contents