Power Steering Unit Installation - Polaris 2015 RZR 900 Service Manual

Hide thumbs Also See for 2015 RZR 900:
Table of Contents

Advertisement

Power Steering Unit Installation

1. If the power steering unit
mount bracket
, reinstall it prior to vehicle
installation. Torque the mounting bolts
specification.
Power Steering Unit Mounting Bolts:
30 ft-lb (41 Nm)
2. Install the power steering unit into the vehicle and
align the skip-tooth spline
stub shaft with the opening in the lower steering shaft
.
3. Place the power steering mount bracket over the top
of the brake pedal mount studs and finger tighten the
four nuts.
was removed from the
1
to
on the power steering
9925723 R01 - 2015 RZR 900 Service Manual
© Copyright 2014 Polaris Industries Inc.
STEERING / SUSPENSION
4. Torque the four mount bracket nuts
Power Steering Unit Mount Bracket Nuts:
16 ft-lb (22 Nm)
5. Position the lower steering shaft on the power
steering unit stub shaft and install the pinch bolt.
Torque to specification.
Lower Steering Shaft to EPS Unit Pinch Bolt:
15 ft-lbs (20 Nm)
6. See Chapter 8 – Upper Steering Shaft Installation,
page 8.14 to complete the installation procedure.
to specification.
8
8.13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents