Drive Shaft / Cv Joint Handling Tips - Polaris 2015 RZR 900 Service Manual

Hide thumbs Also See for 2015 RZR 900:
Table of Contents

Advertisement

FINAL DRIVE
4. 50" ONLY Install the stabilizer bar linkage onto the
upper control arm
specification.
Stabilizer Bar Linkage Fasteners:
40 ft-lbs (54 Nm)
5. Install the wheel and four wheel nuts finger tight.
6. Lower the vehicle to the ground and torque wheel lug
nuts to specification.
Wheel Lug Nuts:
Aluminum: 120 ft-lbs (163 Nm)
Steel: 60 ft-lb (81 Nm)
7.14
. Torque fasteners to
9925723 R01 - 2015 RZR 900 Service Manual
© Copyright 2014 Polaris Industries Inc.
7. Install two washers
spindle. Torque castle nut to specification.
Hub Castle Nut:
110 ft-lbs (149 Nm)
8. Install a new cotter pin
little tighter if necessary to allow the holes to align.
9. Install the center cap on the rim.

Drive Shaft / CV Joint Handling Tips

Care should be exercised during drive shaft removal or
when servicing CV joints. Drive shaft components are
precision parts.
Cleanliness and following these instructions is very
important to ensure proper shaft function and a normal
service life.
• The complete drive shaft and joint should be
handled by getting hold of the interconnecting
shaft to avoid disassembly or potential damage to
the drive shaft joints.
• Over-angling of joints beyond their capacity could
result in boot or joint damage.
• Make sure surface-ground areas and splines of
shaft are protected during handling to avoid
damage.
• Do not allow boots to come into contact with sharp
edges or hot engine and exhaust components.
• The drive shaft is not to be used as a lever arm to
position other suspension components.
• Never use a hammer or sharp tools to remove or
to install boot clamps.
and castle nut
over the
. Tighten the castle nut a

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents