Configuring the UPS for EBMs

To ensure maximum battery runtime, configure the UPS for the correct number of EBMs:
1.
Press any button on the front panel display to activate the menu options, then select SETTINGS, USER
SETTINGS, BATTERY SETUP , and NUMBER OF EBMS.
2.
Use the
or buttons to select the number of EBMs according to your UPS configuration (see Table 11).
Table 11. EBM Selection for UPS Configurations
UPS Configurations
UPS only
UPS + 1 EBM
UPS + 2 EBMs
UPS + 3 EBMs
UPS + 4 EBMs
3.
Press the
button to save the setting.
ESC
4.
Press the
button until the Start screen appears.

Configuring the UPS for Customer-Supplied External Batteries

NOTE
This setting is available only for BladeUPS 12i models.
If you installed a customer-supplied external battery using the External Battery Interconnect accessory, set the
external battery capacity (in Watts per cell) to configure the UPS for the customer-supplied external battery.
The UPS uses the setting to adjust the predicted battery runtime.
Do not attach the External Battery Interconnect to an EBM. Doing so may cause damage to the
EBM or the UPS.
NOTE
To install the External Battery Interconnect accessory, refer to the External Battery
Interconnect User's Guide.
1.
Press any button on the front panel display to activate the menu options, then select SETTINGS, USER
SETTINGS, BATTERY SETUP , and EXTERNAL BATTERY CAPACITY.
2.
Use the
or buttons to select the Watts per cell.
For the correct Watts per cell, see the specifications sheet for the customer-supplied external batteries.
3.
Press the
button to save the setting.
ESC
4.
Press the
button until the Start screen appears.
NOTE
The UPS sets the charge current to the maximum that the UPS charger can supply
and disables the 24-hour recharge battery diagnostic test.
CAUTION
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Operation
Selection
0 (default)
1
2
3
4
99