Standard System Installation
To install the parallel system input and output wiring:
1.
Remove the five screws on the wireway access cover and retain. Remove the cover and retain.
See Figure 32.
Figure 32. Removing the Wireway Access Cover (Bottom Entry Rack Shown)
2.
Bottom Entry Wiring only. Remove the eight screws on the wireway top cover and retain. Slide the
cover back and off the wireway and retain. See Figure 33.
Wireway Top
Cover
Ferrite Assembly
(mounted)
Figure 33. Removing the Wireway Top Cover