Eaton bladeups User Manual page 58

Eaton bladeups 12 kva to 60 kva (n+1) systems
Hide thumbs Also See for bladeups:
Table of Contents

Advertisement

Standard System Installation
To install the parallel system input and output wiring:
1.
Remove the five screws on the wireway access cover and retain. Remove the cover and retain.
See Figure 32.
Figure 32. Removing the Wireway Access Cover (Bottom Entry Rack Shown)
2.
Bottom Entry Wiring only. Remove the eight screws on the wireway top cover and retain. Slide the
cover back and off the wireway and retain. See Figure 33.
Wireway Top
Cover
Ferrite Assembly
(mounted)
Figure 33. Removing the Wireway Top Cover
50
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents