To install the EBM rail kit:
1.
Loosen the assembly wing nuts on both rail assemblies and adjust the rail size for the depth of your rack
(see Figure 20).
Front
Rail Assembly
Figure 20. Adjusting the Rail Depth
2.
Select the proper holes in the rail for positioning the EBMs in the rack.
Place the first rail for the first EBM above the UPS, using positions 37 and 42 for the front hex-head
screws. If you are installing additional rails, place the next rail 4 holes above the last installed screw (see
Figure 21).
NOTE
Verify that the hole patterns on the rails and mounting brackets align with the hole
pattern on the rack.
Assembly Wing Nuts
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7