Ebm Setup; Checking The Ebm Accessories; Rack Setup For The Ebm - Eaton bladeups User Manual

Eaton bladeups 12 kva to 60 kva (n+1) systems
Hide thumbs Also See for bladeups:
Table of Contents

Advertisement

Preassembled System Installation

EBM Setup

The BladeUPS EBM comes with all hardware required for installation in a standard EIA or JIS seismic
rack-mount configuration with square and round mounting holes. The rail assemblies adjust to mount in
standard 19-inch racks with front to rear rail distances from 61 to 76 cm (24 to 30 inches) deep.

Checking the EBM Accessories

Verify that the following items are included with the EBM:
EBM front cover
l
Mounting brackets and fasteners (if not already installed):
l
- (2) mounting brackets
- (4) 6-32 flat-head screws
Rails and fasteners:
l
- (2) sliding rail assemblies (left and right)
- (2) rear hold-down brackets
- (12) hex-head screws
- (4) U-shaped 10-32 clip nuts
EBM user's guide
l
NOTE

Rack Setup for the EBM

The EBM is heavy (see page 130). Removing the EBM from its carton requires a minimum of two
people. Use the corrugated lifting sling (packaged with the UPS) to move the UPS.
NOTE
34
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Discard the EBM user's guide. Use this user's guide to install the EBM.
Mounting rails are required for each individual cabinet.
CAUTION