Standard System Installation
Rails and fasteners:
l
- (2) sliding rail assemblies (left and right)
- (2) rear hold-down brackets
- (16) M5 machine screws
- (8) M5 clip nuts for racks with round holes
- (8) M5 cage nuts for racks with square holes
- (8) M6 hex nuts with integrated washers
Parallel system only. Verify that the following items are included with each Powerware Hot Sync CAN Bridge
Card:
CAN Bridge Card cable with (2) RJ-45 connectors
l
Redundant signal cable with (2) two-position terminal block connectors
l
(2) blue terminating plugs
l

Rack Setup for the UPS

The UPS is heavy (see page 130). Removing the UPS from its carton requires a minimum of two
people. Use the corrugated lifting sling (packaged with the UPS) to move the UPS.
NOTE
To install the UPS rail kit:
1.
Select the proper holes in the rack for positioning the UPS in the rack (see Figure 44).
NOTE 1
NOTE 2
58
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Mounting rails are required for each individual cabinet.
The UPS takes up position 1 through position 12.
Verify that the hole patterns on the rails and mounting brackets align with the hole
pattern on the rack.
CAUTION