11. If the mounting brackets are not already installed, align the two mounting brackets with the screw holes
on the sides of the UPS and secure with the supplied 6-32 flat-head screws (see Figure 49).
Figure 49. Installing the UPS Mounting Brackets
12. Slide the UPS into the rack.
13. Parallel or parallel-ready system only. If you are installing other X-Slot cards besides the Powerware Hot
Sync CAN Bridge Card, skip to Step 16.
NOTE
14. Using four M5 machine screws, secure the front of the cabinet to the rack as shown in Figure 50.
Figure 50. Securing the Front of the UPS
15. Insert the two rear hold-down brackets on the rails into the slots on the rear of the cabinet (see Figure 51).
a.
If necessary, push out on the rack upright to allow the clearance needed to insert the bracket. The
rack upright flexes easily.
b.
Verify that the brackets seat firmly, then tighten the nuts on the rear hold-down brackets. The UPS is
now secured in the rack.
62
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Leaving the UPS unattached allows you to adjust the UPS position in the rack for any
clearance needed to install the X-Slot cards.
Mounting Bracket
6-32 Flat-Head
Screws
Position 9
M5 Screws
Position 4