Eaton bladeups User Manual page 11

Eaton bladeups 12 kva to 60 kva (n+1) systems
Hide thumbs Also See for bladeups:
Table of Contents

Advertisement

BladeUPS Bar
Bottom Entry
Wireway
Figure 2. Example of a BladeUPS Parallel System
Note the following guidelines when configuring your BladeUPS standalone module or parallel system:
The UPS accommodates a maximum of four EBMs.
l
The EBM(s) for a standalone UPS can be mounted directly below the UPS or, with rack side panels removed,
l
in an adjacent rack to the left of the rack containing the UPS.
The EBMs for a parallel system can be mounted in an adjacent rack to the left of the rack containing the UPS
l
(rack side panels removed).
When configured with EBMs, each UPS in a parallel system must have the same number of EBMs installed.
l
Some load equipment may require phase rotation or phase relationship coordination to ensure proper
l
operation. Review your equipment manufacturer's power requirement documents to ensure that your
connected equipment operates correctly.
Figure 56 on page 66 shows an example of a standalone UPS with EBMs. Figure 57 on page 67 and Figure 58
on page 68 show examples of a parallel system with EBMs.
BladeUPS Module
BladeUPS Module
BladeUPS Module
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Introduction
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents