Using two clip nuts and two hex-head screws, attach the rail to the rear of the rack (see Figure 39 and
Figure 40).
The bottom rail uses positions 2 and 4 for the rear hex-head screws. If you are installing additional rails,
place the next rail 7 holes above the last installed screw.
Position 13
Position 11
Position 4
Position 2
Figure 39. Rear Rail Screw Positions for the EBM
Clip Nuts
Figure 40. Securing the Rear Rail
5.
Repeat Steps 3 and 4 for the other rail.
6.
Tighten the assembly wing nuts on both rail assemblies.
The EBM is heavy (see page 130). Moving the EBM requires a minimum of two people.
7 .
Place the EBM on a flat, stable surface with the front of the EBM facing toward you.
8.
If the mounting brackets are not already installed, align the two mounting brackets with the screw holes
on the side of the EBM and secure with the supplied 6-32 flat-head screws (see Figure 41).
Second Rail
First Rail
CAUTION
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Standard System Installation
55