Eaton bladeups User Manual page 59

Eaton bladeups 12 kva to 60 kva (n+1) systems
Hide thumbs Also See for bladeups:
Table of Contents

Advertisement

3.
Remove the six screws on the conduit landing plate and retain. Remove the plate and retain.
See Figure 34.
Bottom Entry Rack
Figure 34. Removing the Conduit Landing Plate
4.
Use a Greenlee punch to provide one or more holes in the conduit landing plate to accommodate the input
and output wiring from the utility to the BladeUPS Bar.
Replace the conduit landing plate.
5.
Connect the input, output, and ground wires to the BladeUPS Bar terminal block according to Figure 35
and Table 6. Route the three input phases and the input neutral through the mounted or loosened ferrite
assembly (see Figure 33).
Ground
Bottom Entry Terminal Block
Figure 35. BladeUPS Bar Terminal Block
Top Entry Rack
Ground
Top Entry Terminal Block
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Standard System Installation
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents