Preassembled System Installation
Figure 16. Removing the UPS Front Cover
3.
Remove the eight screws on the battery cover plate and retain. Remove the plate and retain.
See Figure 17.
Figure 17. Removing the UPS Battery Cover Plate
4.
Slide the battery trays into the cabinet (see Figure 18). Verify that each tray is properly aligned before
sliding the tray in.
When a tray is fully installed, tuck the plastic handle on the end of the tray into place.