Figure 64. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown)

Single Parallel-Ready UPS Installation

Only qualified service personnel (such as a licensed electrician) shall perform the electrical
installation. Risk of electrical shock.
NOTE
Do not make unauthorized changes to the UPSs; otherwise, damage may occur to
your equipment and void your warranty.
To install one UPS in a parallel-ready configuration:
1.
Verify that the UPS is installed in a rail kit in a rack containing a BladeUPS Bar.
2.
Switch off utility power to the distribution point where the parallel-ready UPS system will be connected.
Be absolutely sure there is no power.
3.
Verify that all circuit breakers are in the OFF (O) position.
Plug Retainer
CAUTION
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Standard System Installation
1
2
3
77