Eaton bladeups User Manual page 62

Eaton bladeups 12 kva to 60 kva (n+1) systems
Hide thumbs Also See for bladeups:
Table of Contents

Advertisement

Standard System Installation
Figure 37. Front Rail Screw Positions for the EBM
3.
Secure the rail to the front of the rack with two hex-head screws (see Figure 38).
Front Rail Hex-Head Screws
Figure 38. Securing the Front Rail
54
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Position 15
Second Rail
Position 10
Position 6
First Rail
Position 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents