Standard System Installation
Figure 37. Front Rail Screw Positions for the EBM
3.
Secure the rail to the front of the rack with two hex-head screws (see Figure 38).
Front Rail Hex-Head Screws
Figure 38. Securing the Front Rail
54
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Position 15
Second Rail
Position 10
Position 6
First Rail
Position 1