Eaton bladeups User Manual page 81

Eaton bladeups 12 kva to 60 kva (n+1) systems
Hide thumbs Also See for bladeups:
Table of Contents

Advertisement

9.
Install one of the two supplied blue terminating plugs (see Figure 61) into the CAN IN port on the first UPS
(UPS 1 in Figure 63).
Blue Terminating Plug (CAN IN)
Figure 61. Installing the Blue Terminating Plug (First UPS)
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Standard System Installation
73