Standard System Installation
Move the Eaton logo to the upper part of the door.
6.
Verify that the leveling feet are long enough to lower to the floor. Leveling feet that function solely as pallet
bolt supports may need to be replaced with longer versions. For safety, have one person tilt the cabinet
while a second person switches the feet.
7 .
Optional. For ease of installation, remove the rack side panels, especially the panel on the side nearest
the BladeUPS Bar.
8.
Plan where each cabinet will be located in the rack and determine the "U" marks to use for mounting the
rails. For example, for a rack containing six UPSs and a bottom wireway, plan to mount the bottom of the
rails at the following marks (see Figure 30):
7
Figure 30. Recommended Rail Locations (Example Configuration)
NOTE
9.
Continue to the "Installing the Input and Output Wiring" section.
48
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Recommended rail locations are for example only. Adjust the locations as needed
for your system's configuration. Allow for hole spacing and numbering
(see Figure 30). For guidelines for configuring a parallel system with EBMs, see
page 3.