Eaton bladeups User Manual page 46

Eaton bladeups 12 kva to 60 kva (n+1) systems
Hide thumbs Also See for bladeups:
Table of Contents

Advertisement

Preassembled System Installation
The EBM is heavy (see page 130). Moving the EBM requires a minimum of two people.
7 .
Place the EBM on a flat, stable surface with the front of the EBM facing toward you.
8.
If the mounting brackets are not already installed, align the two mounting brackets with the screw holes
on the side of the EBM and secure with the supplied 6-32 flat-head screws (see Figure 24).
9.
Attach the EBM front cover:
Align the pins on the rear of the front cover with the openings in the EBM. Push the cover firmly into
place. See Figure 24.
6-32 Flat-Head
Screws
Mounting
Bracket
Figure 24. Installing the EBM Mounting Brackets
10. Slide the EBM into the rack.
11. Secure the front of the EBM to the rack using two hex-head screws in each mounting bracket as shown in
Figure 25.
Figure 25. Securing the EBM Mounting Brackets
38
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
CAUTION
Hex-Head
Screws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents